New Monivong Bridge (Cambodia)
• Client: Overseas Cambodian Investment Corp.
• Construction Period: Dec. 2006 to Apr. 2009
• Scope of Work: 3 continuous RC box girder bridge with length 268m (75m+118m+75m) and width 14m
• Client: Overseas Cambodian Investment Corp.
• Construction Period: Dec. 2006 to Apr. 2009
• Scope of Work: 3 continuous RC box girder bridge with length 268m (75m+118m+75m) and width 14m