Ca Cam II Bridge
• Client: Phu My Hung Corp.
• Construction Period: Jul. 2004 to Dec. 2005
• Scope of Work: Two parallel Bridges each 100m in length and 19.75m in width
• Client: Phu My Hung Corp.
• Construction Period: Jul. 2004 to Dec. 2005
• Scope of Work: Two parallel Bridges each 100m in length and 19.75m in width