Monivong Flyover (Cambodia)
• Client: Mega Cambodia Construction Co.
• Construction Period: Aug. 2009 to May 2010
• Scope of Work: Construction of RC box girder bridge with total length 180m and width 14.2m
• Client: Mega Cambodia Construction Co.
• Construction Period: Aug. 2009 to May 2010
• Scope of Work: Construction of RC box girder bridge with total length 180m and width 14.2m