SINO Pacific

Nguyen Van Linh Parkway
• Client: Phu My Hung Corp.
• Construction Period: Phase I, I, III: 1996-1998; 2002-2003; 2004-2007.
• Scope of Work: Roadway 17.8km and 2*27m width, 40 bridges total 1.5km*10.6*2 and 1.5km*15.85*2.