SINO Pacific

Dong Dien Bridge
• Client: Tan Thuan Industry Promotion Company
• Construction Period: Aug. 2008 to Dec. 2009
• Scope of Work: Construction of bridge 408m in length and 18m in width having its main span 75m of Steel Tube Arch Bridge